top of page

Gantry Crane Cap.10t ( MRT JKT Project )

  • Sanki Cranes Indonesia
  • Apr 25, 2016
  • 1 min read

The rail-based Jakarta MRT is expected to stretch across over 108 kilometres, including 21.7 km for the North-South Line (from Lebak Bulus to Kampung Bandan) and 87 km for East-West Line (from Balaraja to Cikarang).

We are really excited to joint the Project to provide Gantry Crane Cap. 10t DRH x 2 Units. with reliable, strong and easy operating Gantry Crane we believe to able support the project running without delay and finished it according schedule.

Not only for Gantry Crane, we are also providing Soil transfer Overhead Crane for the underground work to ease transferring the material out to the surface.

.

.

.

.

.

1 Comment


Hellenna Pieterson
Hellenna Pieterson
Jan 27

Di UNICCM School, pembelajaran tidak hanya soal mengejar nilai. Oleh karena itu, nilai Profil Pelajar Pancasila diterapkan dalam aktivitas belajar sehari-hari. Siswa belajar membangun sikap positif sambil memahami materi. Pendekatan ini terasa relevan untuk kehidupan di luar sekolah.

Like
Featured Posts
Recent Posts
Search By Tags
Follow Us
  • Facebook Classic
  • Twitter Classic
  • Google Classic
bottom of page